2025
Whole-Home Concept
Alberta Street Bungalow
Portland, OR
A 1924 bungalow with nine wall colors and no plan. We reduced it to three, opened the rear wall and phased the work across eighteen months.
The brief was a whole-house repaint. Ten minutes into the first call it was clear a repaint would lock in a kitchen that wanted to move three feet, so the structural work went first and the paint waited until month eleven. Opening the rear wall came out of the phasing plan rather than a wish list, and it stayed the only load-bearing change in the whole program.
Phasing Four stages, 18 months